Overview
- Updated On:
- May 9, 2023
- 2
- 1 Bathrooms
- 70
- Year Built: 2024
Description
The materials used in the construction of “Krtsanisi Grande” ensure the sustainability of the complex. The partners of the project are “Heidelberg Cement”, “Alutech Georgia”, “Doka”, “Bedeg”, “OTIS”, “Smarter” and other European brands.
Thermal insulation materials are used on the external facade of the building, which ensures the energy efficiency of the apartments and protects them from external noise. Aluminum energy-efficient, stained-glass doors and windows with energy-efficient glass package are used.
Construction is being carried out in compliance with construction standards and fire protection systems are fully provided for.
The apartments are equipped with a green frame condition. To get detailed information, contact us on the specified number.